a

Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem nulla consequat. Aenean massa.

leed-ci Tag

  Tenant improvements can require a new company moving into an existing building to create a lot of demolition debris.  In order to build out our Thinkspace executive office suites, 5.79 tons or 11,580 pounds of demolition debris was removed.  The number of tons could have been much greater, but one

Puget Sound Energy (PSE) has awarded a $13,000 conservation grant to Thinkspace for energy efficient lighting retrofits.  Thinkspace's plan calls for a reduction in energy consumption by approximately 21,106 KWH.  Annual energy cost savings are estimated to be a little over two-thousand dollars per year.  Our discussions with PSE have been

In addition to using HEPA air purifiers to maintain air quality during the demolition of the existing space, we also took a close look at the existing HVAC system.  Inside the space we have existing VAV (variable air volume) boxes.  VAV boxes are used to zone areas in large commercial buildings and