Thinkspace’s Goal is Innovation in Design for Recycling
Tenant improvements can require a new company moving into an existing building to create a lot of demolition debris. In order to build out our Thinkspace executive office suites, 5.79 tons or 11,580 pounds of demolition debris was removed. The number of tons could have been much greater, but one of our goals was to […]
How to Maintain Air Quality during the Demolition Stage (Part 2)
In addition to using HEPA air purifiers to maintain air quality during the demolition of the existing space, we also took a close look at the existing HVAC system. Inside the space we have existing VAV (variable air volume) boxes. VAV boxes are used to zone areas in large commercial buildings and also contribute significantly to the […]
How to Maintain Air Quality during the Demolition Stage
During the demolition stage it is paramount to maintain air quality. With a goal of being LEED Certified, we are taking the following precautions into consideration. As the demo is in progress we have two huge dishwasher sized HEPA air purifiers constantly running. The HEPA air purifiers remove particulates, VOC’s (Volatile Organic Compounds), and odors. […]